HOME >  Concrete Structures in Hokkaido > Bridges >  Iwase Bridge

Bridges

Iwase Bridge

Photograph source:「Concrete Bridges in Hokkaido Vol 7」(Association for Civil Engineering Technology of Hokkaido Concrete Research Committee)

Structure name Iwase Bridge
Structure type Post tension method PC 2-span concatenation composite girder bridge
Structural factors Length of bridge:64.60m
Span length:2@31.00mm
Client Muroran Development and Consutruction Dept.,Hokkaido Regional Development Bureau
Designer Docon Co.,Ltd.
Contractor DPS Bridge Works Co.,Ltd.
Location

Hidaka town 42°55′25″N, 142°35′34″E

Route name Number 274 of national highway
Completion date 2018
PAGETOP