
Photograph source:「Concrete Bridges in Hokkaido Vol 7」(Association for Civil Engineering Technology of Hokkaido Concrete Research Committee)
Structure name | Iwase Bridge |
---|---|
Structure type | Post tension method PC 2-span concatenation composite girder bridge |
Structural factors | Length of bridge:64.60m Span length:2@31.00mm |
Client | Muroran Development and Consutruction Dept.,Hokkaido Regional Development Bureau |
Designer | Docon Co.,Ltd. |
Contractor | DPS Bridge Works Co.,Ltd. |
Location | Hidaka town 42°55′25″N, 142°35′34″E |
Route name | Number 274 of national highway |
Completion date | 2018 |