Structure name | Sinngetu Bridge |
---|---|
Structure type | RC fixed arch bridge |
Structural factors | Length of bridge 76.0m Span length 53.0m |
Client | Asahikawa Development and Consutruction Dept.,Hokkaido Regional Development Bureau |
Designer | Docon Co.,Ltd. |
Contractor | Hirono Gumi Co.,Ltd |
Location | Biei town |
Route name | Number966 of General Prefectural Road |
Completion date | 1993. |