
Photograph source:Association for Civil Engineering Technology of Hokkaido Concrete Research Committee
Structure name | Shin-sorachi-ohashi Bridge (Bridge A) |
---|---|
Structure type | Bridge A:Post tension method PC Angle-braced rigid frame bridge Bridge B・C・D・E:Post tension method PC(3+2+3+2)span continuous box girder bridge |
Structural factors | Length of bridge 677.0m Bridge A:Span length 22.5m+30.0m+22.5m、leg inclination angle 26° |
Client | Sapporo Development and Consutruction Dept.,Hokkaido Regional Development Bureau |
Designer | KOKEN ENGINEERING CO.,Ltd |
Contractor | Joint-venture group Obayashi.co・Yasudakensetsu.co・Fukutugumi,co |
Location | Sunagawa city |
Route name | Number 12 of national highway |
Completion date | outbound line:1993、outbound line:1990 |