HOME >  Concrete Structures in Hokkaido > Bridges >  Shin-sorachi-ohashi Bridge (Bridge A)

Bridges

Shin-sorachi-ohashi Bridge (Bridge A)

Photograph source:Association for Civil Engineering Technology of Hokkaido Concrete Research Committee

Structure name Shin-sorachi-ohashi Bridge (Bridge A)
Structure type Bridge A:Post tension method PC Angle-braced rigid frame bridge
Bridge B・C・D・E:Post tension method PC(3+2+3+2)span continuous box girder bridge
Structural factors Length of bridge 677.0m
Bridge A:Span length 22.5m+30.0m+22.5m、leg inclination angle 26°
Client Sapporo Development and Consutruction Dept.,Hokkaido Regional Development Bureau
Designer KOKEN ENGINEERING CO.,Ltd
Contractor Joint-venture group Obayashi.co・Yasudakensetsu.co・Fukutugumi,co
Location

Sunagawa city

Route name Number 12 of national highway
Completion date outbound line:1993、outbound line:1990
PAGETOP